- Permit - Need to get by November
- Build piles for anchor and find size of anchor- November
- Detailed precise measurement for the structure - precise architecture drawing (like details where nuts and bolts)
- need to make sure the materials measurement are exact with the 3d model - for assessment of structure by the insurance
- prioritise working on the structural engineering